Searing Heat and Heavy Rains

Constantly battling high heat and heavy rains in the Lagos region of Nigeria, Sonergy needed a solution in which they could concurrently fabricate two sections of an offshore oil platform. For previous projects during the six-month rainy season their employees would constantly have to stop work and cover sections of a project and repeat the sand blasting and paint process. Their steel shot and steel grit needed to stay dry but was stored outside in bags that were often found torn. This was a frustrating, expensive and inefficient process.

Big Top Provides Protection in an Unforgiving Climate

Now two 90’ x 80’ Big Top structures towering at 45’ tall with large access end panels allow Sonergy to fabricate the massive platform sections and easily roll them out when complete. The sections are out of the rain and dry while workers are out of the sun and cooler. The Big Top structures can withstand the steel abrasive media and contain it. Efficiency is up and Company X can now produce platform sections at an unprecedented rate.

Product Catalogue
Download
Financing Available
Learn More